Three own projects were transferred to Realisation in the period under review. Consequently, the Development department again made a substantial contribution to both capacity utilisation of Realisation and the success of the company as a whole.
The projects referred to above concern an office building with usable floor space of 5,800 square metres located at Hardstrasse 301 in Zurich-West and a residential complex comprising 88 rental units as well as commercial and trade space in two newly constructed buildings on the Grünhof site in Zurich Aussersihl. Upon completion, both buildings will be transferred to the portfolio of yield-producing properties. Another construction project to be started in 2019 refers to a residential complex comprising 20 terraced condominium units located in Zufikon near Bremgarten AG.
Planning permission for the construction of the Dietlimoos-Moos complex in Adliswil was submitted in the second half of 2018. The complex represents a potential construction volume of CHF 180 million. It has been developed for a private investor and comprises six parcels of land. The new buildings were designed by various firms of architects. The complex includes 255 rental units and more than 9,000 square metres of commercial space. Construction start will be defined once planning approval has been obtained.
The development of an own project in Winterthur Seen and the connected approval procedure have been advanced in the period under review to the stage where transfer to Realisation will occur in the first half of 2019. The project implemented on land measuring 11,582 square metres comprises 8 apartment buildings with a total of 52 condominium units at an investment of approximately CHF 55 million. Construction start depends on the progress of approval procedure, possibly in the second half of 2019.
In the period under review, the Development department intensified its search for suitable land and acquired two tracts of land, one in Lucerne Eggen and the other in Zurich Albisrieden. Both properties are ideally suited for the development and realisation of condominium apartments in the medium price segment, which enjoys high demand.
The realisation of a residential complex comprising more than 70 condominium units is planned for the 8,386 square-metre property acquired from a private seller in Lucerne Eggen. The investment volume is estimated at CHF 33.5 million. In view of the design plan required by law, a project competition with six participating firms of architects was initiated in the second half of 2018. Adjudication will be carried out in the course of the first half of 2019.
The second acquisition concerns land with a building on it at an excellent and well developed location in Zurich Albisrieden measuring 2,195 square metres. The location in a zone with a high utilization rate allows for the implementation of about 40 condominium apartments. Ownership of the property acquired for CHF 22.5 million was transferred with effect from end November 2018. A project competition for the development at an estimated project volume of CHF 47.0 million will be implemented in 2019.
Further project developments initiated or processed significantly in the 2018 financial year in addition to participation in several full-service project competitions include:
Dietlimoos-Moos | Residential, trade | Adliswil ZH | ||
Post Office site/Bahnhofstrasse | Office, trade | Baden AG | ||
Delta-Areal | Residential | Solothurn | ||
Poststrasse | Residential | Zurich City | ||
Renovation commercial building* Bellerivestrasse 36 | Office | Zurich Riesbach | ||
Renovation Escher-Wyss welfare* building | Trade, office | Zurich-West |
* Own project